A virtualization project starts with understanding what is already running. A short assessment helps your team choose a sensible first workload and avoid moving hidden dependencies into a new environment.
Collect CPU, memory, storage, and network data across normal operating periods and known peaks. Note which workloads spike together. Include backups, batch jobs, and reporting runs in your observations so they are represented in capacity planning.
Document which applications rely on each database, shared drive, or authentication service. Confirm software support and licensing for the proposed environment. Agree on acceptable downtime and data loss for each workload, then check whether the backup and recovery process can meet those needs.
Choose a representative workload with a clear owner and a manageable rollback. Test connectivity, performance, monitoring, backup, and restore before moving additional workloads. Compare the pilot results with the original measurements and use them to plan the next migration group.
CET can help assess workloads and plan a phased migration. Explore Virtualized Infrastructure services.

Build a repeatable inspection routine for UPS units, batteries, and the rooms that house them.
Read article
Make the handover smoother with a shared system inventory, a clear access plan, and agreed escalation paths.
Read article